Agar oil distillation plant |
|
Features:Robust for longtime use.Stainless and chemical resistant steel material for main body construction.Required sensors and meters. |
Technical Specifications: |
Brand | : TFB/TL/500. |
Model | : ThermoFlame. |
Steam Chamber | Supply of Steam Chamber as per the drawing by using SS food grade 5mm plate, motor, chassis, safety valve, meter in all complete. |
Condensate Recovery Tank | Supply and installation of Condensate recovery tank. The Tank will be fabricated out of 2.5mm thick Stainless-steel plate, insulated 2” thick mineral wool &Covered with SS Sheet (18Swg), The Tank will be provided with as 08nos nozzle pipe, 02nos SS ball valve, 01 no’s blow down valve, 01 no’s Man hole,01 set Gauge glass setting, flange nut bolt with in all complete. |
Steam Boiler | Supply of vertical Dual fuel 500kgTubeless boiler imported body, burner, water level controller, feed pump and other services. Steam generating capacity: 500Kg/hr. Maximum working pressure: 100 Psi. Burner: Thermos Flame Brand. |
Fuel | Diesel/Natural gas/LPG/CNG. Pressure Controller: U.S.A./Korea. Feed water pump: Petrillo/Equivalent. |
Water Softener | Base Exchange auto Water Softener, completely assembled with ABS Plastic multi-port valve, brine valve and PE salt tank and initial charge of cation resin. |
Dosing Pump | Supply of Boiler Chemical Dosing Pump. Milton Roy, India. Including Chemical Dosing Tank and fittings. |
Commissioning | Our service Engineer will undertake commissioning and trial run of the boiler for 2 (Two) working days after completion of installation of the Boiler and its related works at your factory. This service also includes providing necessary training to the attendant covering its operation & maintenance procedures free of charge. |
Warranty | We guarantee our products against all defects for trouble free operation subject to compliance of all instruction and requirements as issued within the related operation and maintenance manual. Should there be any defects detected during the period of warranty. We shall provide our services (inc luding replacement of parts/component as necessary.) free of cost to make good the defects. The warranty period (in case of boiler and water softener) is twelve calendar months from the date of commissioning or eighteen calendar months from the date of supply. Please note that any damages/defects caused to the boiler due to scale deposition on waterside of the boiler would not be covered under above warranty. |
| Registration fee.Supply of boiler chimney, gas regulator and feed water tank, diesel tank are to be buyer’s responsibility.Installation of the boiler, water softener, feed water tank or any other interconnect piping system.Any piping works like steam distribution, condensate return, water incoming & related drain outlets.Any works relating to Power Gas connection to the boiler.Carrying and transportation of the boiler to factory site are to be buyer’s responsibility. |
Country of Origin | Bangladesh. |
Make and assembly | Bangladesh. |
Certification | Yes |
Manufacturer Warranty and guaranty | Yes |
Extended Warranty and guaranty | Five years |
Fitting/ Installation/ Service | Included |
Accessories | Required |
Training | 2 days training on maintenance, trouble shooting, operation, and application of equipment will be provided by us after installation and commissioning. We will train up the appointed scientists/experts/technician until ready for operation. |
Packing list | Packing list from manufacturer will be provided with system |
Catalog | Manufacturer catalogue submitted in English |
Remarks (any) | N/A |
Price | Included. |